Electrolyzer Manufacturer Comparison
Compare specifications, costs, and performance metrics across leading electrolyzer vendors
Filter Options
Select Manufacturers to Compare
Detailed Specifications
| Specification | π¬π§ ITM Power NEPTUNE V / POSEIDON | π³π΄ Nel Hydrogen A Series Alkaline | π³π΄ Nel Hydrogen MC/PSM Series PEM |
|---|---|---|---|
| Technology | PEM | Alkaline | PEM |
| Capacity Range | 5-120 MW | 1-500 MW | 1-20 MW |
| Efficiency | 50 kWh/kg Hβ | 42 kWh/kg Hβ | 52 kWh/kg Hβ |
| Purity | 99.999%+ | 99.9% | 99.999%+ |
| Response Time | 1 second | 5-10 seconds | 2 seconds |
| CAPEX | $1160/kW | $750/kW | $1200/kW |
| OPEX (annual) | $35/kW/yr | $25/kW/yr | $38/kW/yr |
| Expected Lifetime | 20 years | 25 years | 20 years |
| Load Following | |||
| Self-Pressurizing | |||
| Modular Design | |||
| Outdoor Rated |
Cost Comparison
- CAPEX ($/kW)
- OPEX ($/kW/yr)
- Total 10yr
Performance Comparison
- ITM Power
- Nel Hydrogen
- Nel Hydrogen
All metrics normalized to 0-10 scale for comparison
π¬π§
ITM Power
NEPTUNE V / POSEIDON
Advantages
- +Fastest response time (1 sec)
- +Highest purity output
- +Proven track record in Europe
- +Self-pressurizing capability
Considerations
- -Higher capital cost
- -Limited manufacturing capacity
- -Newer to gigawatt-scale projects
Recent Projects
- β’ 710 MW Germany order
- β’ 120 MW Uniper project
- β’ 50 MW standardized plant
π³π΄
Nel Hydrogen
A Series Alkaline
Advantages
- +Best energy efficiency (3.8-4.4 kWh/NmΒ³)
- +Lowest capital cost
- +Longest lifetime (25 years)
- +Proven alkaline technology
Considerations
- -Lower purity vs PEM
- -Slower response time
- -Requires external compression
- -Less suitable for intermittent operation
Recent Projects
- β’ 1 GW Mississippi Clean Hydrogen Hub
- β’ 1 GW annual manufacturing capacity
π³π΄
Nel Hydrogen
MC/PSM Series PEM
Advantages
- +High purity output
- +Fast response time
- +Excellent for renewable integration
- +Compact footprint
Considerations
- -Higher cost than alkaline
- -Shorter lifetime than alkaline
- -Indoor installation preferred
- -Higher maintenance requirements
Recent Projects
- β’ Multiple 1-20 MW installations globally